Installed electricity generation capacity in megawatts, with grid-connected renewable energy, State and UT level, 2004-05 to 2024-25 (RBI Handbook).
The first 5 of 1,338 rows
| period | period_type | geo_level | geo_code | geo_name | state_as_printed | ref_period | ref_period_type | period_note | measure | value | unit | table |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2024-25 | academic_year | state | 1 | Jammu and Kashmir | Jammu & Kashmir | 2004-05 | financial_year | Installed capacity of power | 1502.0 | megawatts | 140 | |
| 2024-25 | academic_year | state | 1 | Jammu and Kashmir | Jammu & Kashmir | 2005-06 | financial_year | Installed capacity of power | 1455.0 | megawatts | 140 | |
| 2024-25 | academic_year | state | 1 | Jammu and Kashmir | Jammu & Kashmir | 2006-07 | financial_year | Installed capacity of power | 1626.0 | megawatts | 140 | |
| 2024-25 | academic_year | state | 1 | Jammu and Kashmir | Jammu & Kashmir | 2007 | year | Total installed capacity of grid interactive renewable power | 112.0 | megawatts | 143 | |
| 2024-25 | academic_year | state | 1 | Jammu and Kashmir | Jammu & Kashmir | 2007-08 | financial_year | Installed capacity of power | 1709.0 | megawatts | 140 |
It reports installed capacity for generating electricity in megawatts at the end of March (Central Electricity Authority) and the installed capacity of grid-interactive renewable power (Energy Statistics, Ministry of Statistics and Programme Implementation). It has 1,338 rows, one per State or UT, reference period and measure: 37 States and UTs (Kerala has 39 rows), 2 measures, 2004-05 to 2024-25. Values are in megawatts. Measure names: Installed capacity of power; Total installed capacity of grid interactive renewable power. The rows come from tables 140, 143 of the Reserve Bank of India's Handbook of Statistics on Indian States, 2024-25 edition.
| Column | Label | Description | Unit |
|---|---|---|---|
period | Edition | Edition of RBI's Handbook of Statistics on Indian States the row comes from, named after its financial year; a year can be reprinted in a later edition | |
period_type | Edition period type | Type of the edition label (YYYY-YY, a financial year) | |
geo_level | Geography level | Always state (States and union territories) | |
geo_code | LGD code | Local Government Directory code of the State or union territory (Kerala is 32) | |
geo_name | State or UT | State or union territory name in LGD spelling | |
state_as_printed | State as printed | State or union territory name exactly as printed in the RBI table | |
ref_period | Reference period | Year the figure belongs to: a calendar year (YYYY), a financial year (YYYY-YY) or a multi-year span (for example 2016-20); see ref_period_type | |
ref_period_type | Kind of reference period | year: a calendar year; financial_year: a year from April to March; multi_year: a span of several years | |
period_note | Period note | Estimate marker printed with the year in RBI's header, such as P (provisional), R (revised), E or AE; blank when none is printed | |
measure | Measure | What is measured: the RBI table title followed by the column heading and any basis printed above it (for example the price basis or the sex) | |
value | Value | Number as published, in the unit given in the unit column | |
unit | Unit | Unit of value, as printed above the table | |
table | Handbook table number | Number of the table in the 2024-25 edition of the Handbook that the row comes from |
Please cite this dataset when you use it:
Policy and Research Initiative (2026). Installed power generation capacity including grid renewables of States and UTs, 2004-05 to 2024-25, RBI Handbook of Statistics on Indian States (Version 1.0.0) [Data set]. Original data: Reserve Bank of India. /data/rbi-hbs-power-capacity-india