Dataset · Infrastructure
Yearly plant load factor (per cent) of each KSEB hydroelectric station, showing how fully each plant was used every financial year
The first 5 of 355 rows
| period | period_type | geo_level | geo_code | geo_name | fiscal_year | station | plf_pct |
|---|---|---|---|---|---|---|---|
| 2023-24 | academic_year | state | 32 | Kerala | 2015-16 | Adyanpara | 7.0 |
| 2023-24 | academic_year | state | 32 | Kerala | 2016-17 | Adyanpara | 16.32 |
| 2023-24 | academic_year | state | 32 | Kerala | 2017-18 | Adyanpara | 12.0 |
| 2023-24 | academic_year | state | 32 | Kerala | 2018-19 | Adyanpara | 1.05 |
| 2023-24 | academic_year | state | 32 | Kerala | 2019-20 | Adyanpara | 7.85 |
The annual plant load factor (PLF) of each hydroelectric station of the Kerala State Electricity Board Limited, as published in its Power System Statistics report. PLF is the share of a plant's full-capacity output that it actually generated in the year, in per cent. Stations are listed by name, from the large Idukki and Sabarigiri plants to small hydro schemes, for each financial year from 2013-14 to 2023-24; newer stations appear only from the year they started. Use it to compare how intensely plants are used and how monsoon years change output.
| Column | Label | Description | Unit |
|---|---|---|---|
period | Report edition | Edition of the Power System Statistics report the row was read from (2022-23 or 2023-24) | |
period_type | Edition period type | academic_year: the report is for a financial year | |
geo_level | Geography level | state: every row is for Kerala | |
geo_code | LGD code | Local Government Directory code of the state of Kerala (32) |
Please cite this dataset when you use it:
Policy and Research Initiative (2026). Annual plant load factor of KSEB hydro stations in Kerala, 2013-14 to 2023-24 (Version 1.0.0) [Data set]. Original data: Kerala State Electricity Board Limited (KSEBL), Planning Wing. /data/kseb-hydro-plf-kerala
geo_name | Area | Kerala |
fiscal_year | Financial year | Financial year (April to March) the figure is for, written as start year and two-digit end year, such as 2023-24 |
station | Station | Name of the KSEB hydroelectric station as printed; combined entries are kept as printed |
plf_pct | Plant load factor (%) | Annual plant load factor of the station, per cent |